top of page

TUPPER LAKE CENTRAL SCHOOL DISTRICT

Tupper Lake, NY

The district’s capital program consists of significant upgrades and renovations to the elementary and high schools, bus garage, civic center (ice arena), and athletic fields.  Besides general building renovation work to the exterior shells (roofing, windows, etc.), numerous bathrooms are being remodeled, gymnasiums are receiving upgrades, and the main auditorium is being redone with new architectural finishes and electrical upgrades.  The civic center is receiving a second level on its enclosed spectator space, additional locker room space, and various mechanical enhancements.  Several natural athletic fields are being reconstructed and provided with various upgrades.  Lastly, there is a significant amount of HVAC units that are being replaced with more energy efficient equipment in the District’s main offices located at both the elementary and high schools. 

 

Project Cost: Approx. $8.5M    

Tupper Lake Football field
037A6032-HDRcopy
037A6077-HDR
037A5988-HDR
037A6185-HDR
037A6155-HDR
IMG_3119
IMG_3123
IMG_0711
IMG_1451
IMG_0705
IMG_1461
IMG_1868
IMG_1488
IMG_1467
IMG_1454
IMG_0280
IMG_0282
IMG_0246
FYRG8261
IMG_0247
IMG_0279
ENOF1767
BFNF8703
bottom of page